EOT Claims and Liquidated Damages: What Recent Rulings Mean For Your Contracts

August 12, 2025by Sudha Sampath0

In the complex arena of construction projects, deadlines extend beyond mere dates; they embody contractual duties, financial stakes, and professional reputations. Among the critical facets of managing such projects is the handling of time claims, commonly known as Extension of Time (“EOT”) requests. These claims, when managed effectively, are vital tools for contractors seeking fair project timelines and protections from undue penalties. Central to a successful time claim is the comprehensive and well-maintained Work Program.

 

Understanding Construction Time Claims

 

Construction claims generally fall into two categories:

  1. Monetary Claims: Seeking financial compensation for additional costs incurred due to changes, disruptions, or unforeseen conditions.
  2. Time Claims: Seeking an extension of the contractual completion date because of delays beyond the contractor’s control.

Though distinct in theory, these claims are deeply interconnected as delays often translate into cost overruns. Thus, an EOT is often the first defensive step a contractor takes to mitigate potential financial damages.

 This blog is a part of our Global Arbitration Services.

When Are Time Claims Justified?

 

Time claims typically arise from delays caused by various sources, including:

  • Delays by employers or engineers, such as late site handover, slow approvals, delayed designs, or prolonged instructions.
  • Changes in project scope or unforeseen variations and design changes requiring additional work.
  • Force majeure events like extreme weather, strikes, pandemics, or other uncontrollable events.
  • Interferences by third parties, including utilities or other contractors, delays caused by utility agencies, subcontractors, or other external stakeholders.

Having a valid reason alone is insufficient; claims must be substantiated with solid documentation and a logical timeline linked clearly to the delay’s impact.

 

The Work Program as the Cornerstone of Claims

 

An AWP, also called a Baseline Schedule, is far more than a simple project timeline. It is the formal blueprint showing:

  • How the contractor planned to complete the project,
  • The sequencing and timing of activities,
  • Dependencies and contractual milestones.

Once approved, it becomes the contractual benchmark for assessing any delays and justifying extensions of time.

When delays or variations occur, the baseline must be adjusted into an IWP, reflecting how specific disruptions have affected the critical path and overall completion date.

 

Practical Delay Analysis

 

Although international delay analysis protocols exist, many practitioners prefer a simple, logical, and evidence-based approach, which includes:

  • Precisely recording the start and end dates of delay events.
  • Clear attribution of responsibility (employer, contractor, force majeure, or third parties).
  • Eliminating overlapping events to avoid double counting delays.
  • Supporting each claimed delay with documentary evidence such as correspondence, site diaries, Requests for Information (RFIs), weather reports, and third-party notifications.

This straightforward method enhances the claim’s transparency and acceptability before engineers, arbitrators, and courts.

 

Common Scenarios Encountered in Time Claims

 

Time claims typically fit into three common scenarios:

  1. Delays and Impediments: Late land handovers, delayed design approvals, or external stoppages.
  2. Scope Changes: Additional works or design modifications necessitating reprogramming.
  3. Combinations of both: Complex situations involving multiple overlapping delay sources.

Each scenario requires solid delay analysis integrated into the IWP to substantiate entitlement accurately.

 

Addressing Coordination Challenges

 

One critical reason time claims fail is poor internal coordination. Success depends on collaboration between:

  • Contracts Engineers: Who monitor contractual obligations, track delays, issue timely notices, and prepare documented delay analyses.
  • Planning Engineers: Who maintain dynamic scheduling and update impacted work programs to reflect current realities.

Early and ongoing communication between these teams strengthens the validity of time claims.

 

Best Practices for Legal Counsel and Construction Professionals

 

  • Encourage preparation of a thorough Baseline Work Program before project commencement.
  • Emphasize the importance of prompt notice issuance upon encountering delay events.
  • Advocate for regular and integrated coordination between planning and contracts teams.
  • Support claims with clear, chronological delay analyses backed by comprehensive evidence.
  • Ensure the formulation of an IWP that transparently reflects the disruption impact.

 

Recent Supreme Court Decisions Relevant to Time Claims and Work Programs

 

Recent rulings of the Supreme Court of India have provided important clarifications on how EOT claims, liquidated damages, and work program evidence should be treated in construction disputes:

  1. In a landmark judgment of the Supreme Court of India, Consolidated Construction Consortium Limited Versus Software Technology Parks of India[1], the Supreme Court addressed a construction contract dispute involving multiple extensions of time granted due to the contractor’s admitted inability to complete work within the original schedule. The Court held that when extensions of time are formally granted, the imposition of liquidated damages alongside such extensions is generally unjustified unless there is clear evidence of actual loss suffered. The Court reaffirmed the principle that the AWP serves as the contractual baseline, and extensions effectively negate breach claims for delay
  2. In M/s. C & C Constructions Ltd. versus IRCON International Ltd[2], the Supreme Court upheld the enforceability of limitation of liability clauses in construction contracts. The Court observed that acceptance of extensions under an agreed contractual scheme may constitute an irrevocable election by the contractor, barring additional claims for damages beyond contract terms. This ruling emphasized the importance of clear contractual provisions and proper documentation of time extensions in framing entitlements
  3. The Supreme Court in Welspun Specialty Solution LimitedOil and Natural Gas Corporation Ltd.[3] has reiterated that time is not always the essence of the contract in construction matters. This means extensions allowed under the contract prevent automatic forfeiture of rights due to delay, provided the contractor complies with notice requirements and maintains proper documentation. This protects contractors from unjust penalties when delays arise from employer actions or force majeure
  4. Arbitration rulings affirmed by the Supreme Court highlight the importance of delay analysis that is simple, logical, and supported by concrete evidence, rather than conjecture or complex theoretical models. Courts and arbitral tribunals are inclined to uphold claims substantiated by transparent IWP demonstrating cause-and-effect relationships between delays and completion timelines.

 

These cases show the Supreme Court’s evolving stance emphasizing contractual clarity, bona fide extension processes, evidentiary support, and balanced enforcement of liquidated damages in construction contract disputes involving time extensions. These decisions underscore that in construction disputes, a properly documented Work Program and reliable delay analysis are powerful tools in arbitration and litigation to defend or challenge claims for extensions and damages.

 

Key Takeaways From Recent Supreme Court Rulings

 

The recent Supreme Court cases on contract extensions in India carry significant implications for disputes involving liquidated damages and EOT claims:

  1. Extension of time negates liquidated damages for covered delays: When extensions of time are formally granted under contract terms, the imposition of liquidated damages for delays covered by those extensions is generally unjustified unless there is clear evidence of actual loss. This means that contractors who obtain valid EOTs are protected from automatic penalty claims for the extended period. Liquidated damages cannot be imposed in addition to a properly granted extension, reinforcing the protective nature of extension clauses.
  2. Acceptance of extensions constitutes an irrevocable election: Contractors who accept and rely upon extensions under the contract scheme make an irrevocable election that typically bars them from later seeking separate claims for damages related to the same delay. This elevates the importance of clear contractual language and timely documentation around extensions, as contractors must be cautious not to waive or lose rights inadvertently.
  3. Flexibility in contractual timelines: The courts have clarified that time is not always the essence of the contract, meaning that construction contracts allow for some flexibility through extensions without automatically constituting a breach. Provided contractors comply with notice and evidence requirements, extensions granted under the contract avoid automatic forfeiture of rights and penalties.
  4. Importance of evidence-based delay analysis: Disputes over liquidated damages and extensions increasingly turn on the quality of delay analysis and supporting evidence. Courts prefer straightforward, logical analyses integrated into AWP and IWP, supported by clear documentary proof. Claims reliant on technical, complex delay models without transparent linkage to actual delays face challenges in enforcement.
  5. Encouragement of early coordination and compliance: The rulings emphasize the need for early and ongoing coordination between legal, contracts, and planning teams to track delays, issue timely notices, and maintain dynamic scheduling records. This procedural rigor mitigates risks of losing entitlement to extensions or facing liquidated damages claims.

This jurisprudential approach fosters fairness, reduces unnecessary litigation, and enhances the reliability of contract time management in Indian construction projects.

 

Implications for Arbitration and Litigation

 

  1. Arbitral tribunals will place greater emphasis on whether extensions of time were formally granted and documented according to contractual procedures. Proper recognition of approved extensions will be a critical threshold determining the fate of liquidated damages claims and delay penalties.
  2. Tribunals will expect clear, logical, and well-supported delay analyses that integrate the Approved Work Program and Impacted Work Program. Simplified, evidence-based approaches demonstrating a direct cause-and-effect relationship between delay events and extensions will be favored over highly technical or theoretical delay models.
  3. The rulings underscore the need for timely issuance of notices, continuous documentation, and interdepartmental coordination between contracts and planning functions. Arbitrators may scrutinize procedural compliance when assessing entitlement to extensions to ensure fairness and contractual fidelity.
  4. If extensions are validly granted and documented, arbitral tribunals are likely to disallow liquidated damages claims for the corresponding period of delay unless compelling evidence of actual loss or breach exists. This reinforces the mutually exclusive nature of extensions and liquidated damages, shaping arbitral awards.
  5. With clearer Supreme Court guidance, arbitration processes may become more efficient and less adversarial, as parties will be incentivized to maintain disciplined contract management and transparent scheduling records to support their claims or defenses.
  6. Recent jurisprudence allowing extensions of arbitral timelines beyond statutory limits (e.g., Section 29A[4] of the Arbitration Act) combined with the emphasis on procedural and evidentiary rigor, may encourage arbitrators and parties to seek reasonable extensions to ensure comprehensive adjudication of complex extension disputes.

In summary, these rulings encourage arbitral tribunals to ground their decisions on strong documentary evidence, sound delay analyses, and contractually compliant procedures. This development is poised to elevate the professionalism and reliability of arbitration in contract extension conflicts, reducing unnecessary litigation and promoting fair resolutions aligned with contractual intentions.

 

Conclusion

 

In a legal landscape where time truly equals money, recent rulings chart a clear path for contractors, employers, and legal advisors, document delays meticulously, anchor claims in robust Work Programs, and ensure procedural compliance from day one. These pronouncements affirm that properly granted and substantiated extensions protect against liquidated damages and enhance arbitration and litigation outcomes.

The takeaway is simple: treat your Work Program as more than a scheduling tool, treat it as your primary defense in protecting timelines and reputations. Well-prepared contractors don’t just survive delays; they turn them into legally defensible outcomes.

Foot Notes………………………………………………………..

[1] 2025 INSC 574, dated 28th April 2025

[2] 2025 INSC 138, dated 31st January 2025

[3] 2021 SCC OnLine SC 1053, dated 13th November 2021

[4] Section 29A imposes a statutory timeframe for arbitral awards in India. It mandates that, in domestic (non-international commercial) arbitrations, the tribunal must deliver the award within twelve months from the completion of pleadings. Parties may, by agreement, extend this period for up to six additional months. Beyond that, if no award is rendered, the tribunal’s mandate automatically expires, unless the court grants an extension “before or after” the lapse, requiring sufficient cause, with discretionary conditions such as substituting arbitrators or reducing fees for tribunal delays, provided the tribunal continues if an extension application is pending, and the court disposes of such application within sixty days if possible

Disclaimer

This article is intended for general informational purposes and does not constitute legal advice. The opinions expressed in this blog are those of the respective authors. ATB Legal does not endorse these opinions. While we make every effort to ensure the factual accuracy of the information provided in our blogs, inaccuracies may occur due to changes in the legislative landscape or human errors. It is important to note that ATB Legal does not assume any responsibility for actions taken based on the information presented in these blogs. We strongly recommend taking professional advice to ensure the best possible solution for your individual circumstances.

About ATB Legal

ATB Legal is a full-service legal consultancy in the UAE providing services in dispute resolution (DIFC Courts, ADGM Courts, mainland litigation management and Arbitrations), corporate and commercial matters, IP, business set up and UAE taxation. We also have a personal law department providing advice on marriage, divorce and wills & estate planning for expats.

Please feel free to reach out to us at office@atblegal.com for a non-obligatory initial consultation.

by Sudha Sampath

Sudha has more than 15 years of experience in legal practice, with a strong focus on arbitration and commercial litigation. She currently specializes in managing complex disputes within the DIFC and ADGM legal frameworks, leveraging her in-depth knowledge of court procedures, arbitration rules, and cross-border enforcement mechanisms.Prior to joining ATB Legal, Sudha was associated with prominent law firms and Designated Senior Counsels in Delhi and Chennai. Over the years, she has represented clients in a wide range of high-stakes commercial disputes before the Supreme Court of India, High Courts and various District Courts in Delhi and Chennai, the Company Law Board, Debt Recovery Tribunals and Appellate Tribunals, State and District Consumer Forums, and Arbitral Tribunals.

Leave a Reply

Your email address will not be published. Required fields are marked *

Copyright © 2019-2024 ATB Legal Consultancy FZ LLC, All rights reserved. | Privacy Policy | Disclaimer

Disclaimer

This website provides general information only, may not reflect current law, and should not be acted upon without professional advice.